Pre Engineered Steel Warehouse Building For Sale
Main Steel | Column and beam—Q235, Q355 steel with high strength and stiffness, high weight-bearing |
Secondary frame | C steel, Z steel, square tube, steel angle, tie bar, tension rod, and bracing. |
Connection method of steel structure | Welding connection or bolt |
Roof and wall material corrugated | Corrugated sheets, sandwich panel (EPS, ROCK WOOL, GLASS WOOL) |
Connections | Anchor, high strength/ordinary bolts, steel plate, etc |
The installation of the steel structure warehouse is very fast, which can meet the needs of some manufacturers for emergency warehouse construction, and has obvious advantages during the construction period.
In addition, the construction cost and labor cost of steel structures are usually 20%~30% lower than the concrete warehouse, and it is safer and more stable.